A staged, gated process that turns land or an existing building into a build-ready site.

Every site moves through seven stages. Each one ends in a go/no-go decision, so capital goes in only as risk comes out.

  1. Stage 01

    Site control

    Site identified and screened, whether open land or an existing building, ownership confirmed through title, the property visited and documented, and an option agreement executed.

    Decision point

    Site under option

  2. Stage 02

    Power

    Electric and gas paths assessed side by side: utility substation and transmission capacity, load studies and will-serve letters on the electric side; pipeline, supply studies and the gas utility for on-site generation. Deliverable megawatts confirmed.

    Decision point

    Power confirmed

  3. Stage 03

    Feasibility and engineering

    Site engineer engaged, existing structures evaluated, cooling approach and equipment assessed, zoning and the air-permit pathway confirmed, and a full financial model built.

    Decision point

    Feasibility confirmed

  4. Stage 04

    Water and environmental

    Water availability and rights confirmed. A Phase I environmental site assessment is completed, with Phase II work and remediation scoped where needed.

    Decision point

    Environmental clear

  5. Stage 05

    Fiber and access

    Fiber routes mapped, multiple carriers engaged, and last-mile cost and timeline estimated.

    Decision point

    Fiber path confirmed

  6. Stage 06

    Political and community

    Municipal officials engaged early, community outreach begun, incentives explored, and community benefit agreements drafted where appropriate.

    Decision point

    Local alignment confirmed

  7. Stage 07

    Packaging and exit

    The site is assembled into a certainty package and taken to buyers, or carried further into development.

    Outcome

    Transaction

At exit

Two paths, chosen site by site.

Sell

We sell de-risked sites to data center developers and operators at the point where our work saves them the most time: power confirmed, diligence complete and a clear path to construction.

Advance

Where it creates more value, we carry the strongest sites further into development before bringing in a long-term owner.

The certainty package

What a buyer receives.

Our work is designed to answer a buyer's diligence questions before they ask them. Contents vary by site.

  • Option or purchase agreement, with title work
  • Utility capacity and will-serve letters, and gas supply studies where generation is on site
  • Water availability and Phase I environmental site assessment
  • Fiber route mapping and last-mile cost estimate
  • Zoning confirmation and air-permit pathway
  • Engineering, equipment and financial analysis
  • Record of municipal and community engagement